What a great week we had for Dredging!  No rain and bright sunshine has allowed us to haul over 1600 yds over the past week.  This brings out total approximate yards removed to 5,000 yds!  Unfortunately, the Dredging suffered a road bump today when the large excavator suffered a hydraulic hose leak.  This leak was located inside the tracks, near the motor that drives the machine.  Leaks in this area are very hard to fix because of limited access inside the machine.  Let's hope that they can get it fixed by the morning and we can keep achieving our goal of hauling 500yds a day!  I have attached a picture on what it looks like repairing such a leak!