Sunday, September 2, 2018
Fall Greens Aerification
The Fall Greens Aerification is Tuesday, September 4th. This will be the large holes and heavy sand. Typically this process takes 3 to 4 weeks to fully recover. We know this is a very unpopular time for the avid golfer, but it is very important for the roots and overall health of the putting greens!!
Fall Armyworms!!!!
Over the last week we have noticed a large hatch of Armyworms!!! How do we know we have an outbreak of Armyworms? Because they are eating the grass! Take a look at the picture below and you can see where the left side of the grass is brown, while the other half is green.
The brown grass on the left is infected with Armyworms, and they are literally "marching" their way across the green grass by eating all the green stuff they can see!! This picture is of #7 Overlook, but we discovered Armyworms all across both golf courses.
Take a look at the next picture to see how we identify where the worms are:
The brown grass on the left is infected with Armyworms, and they are literally "marching" their way across the green grass by eating all the green stuff they can see!! This picture is of #7 Overlook, but we discovered Armyworms all across both golf courses.
Take a look at the next picture to see how we identify where the worms are:
A "soapy flush" is used to push all the worms and insects to the top of the turf canopy. Once we see signs in the turf that we may have an insect problem, we will do soapy flushes across the golf course to identify what areas we need to treat.
If you look closely in the picture you can see 5 or 6 Armyworms. This is what we look for after a soapy flush. Once we saw all the worms in one small area, we confirmed we had a problem. The good news is a light insecticide application will kill them on contact, and the grass will make a full recovery in a few weeks! If you see your yard at home looking unusually brown or lacking color, do a soapy flush and see if you have Armyworms!!!
Thursday, June 28, 2018
Tennis Clay Courts
Monday, June 25th was a great day to renovate our tennis courts! The Club hired a contractor to install 40,000 pounds of new clay to court #1, and then use a laser level to completely re-build and re-grade the court. This new clay will allow for an overall better playing surface, and has to be done every 5-8 years as a maintenance practice. The crew also took the opportunity to add 10,000 pounds of new clay to courts #5 and #6. New lines were installed after the clay was added and leveled on all the courts. We hope that you will find the new surfaces enjoyable and help improve your game!
Please take a minute to look at the videos and pictures of the entire process!!!!!
This video shows the Clay being dumped onto the court for the tractor to push into place.
This video shows the tractor dragging the Clay across the court to "grade" it, or make it level. This tractor has a Laser controlling the amount of Clay spread across the court. The goal is to get the Clay as level and flat as possible, but still slightly sloped so the water drains when it rains.
This video shows one person installing Clay on courts #5 and #6, while the other person is dragging it around smoothly with a cart. Since we put less Clay on these courts, the tractor was not needed. Approximately a quarter inch of new Clay was installed on these courts to help freshen them up.
This video show them rolling the lines to flatten them into the new Clay profile. This will help to ensure the lines are flat and secure to the ground. The lines are rolled 5 or 6 times before the court is ready for play.
This shows the truck of Clay as it arrived. Each large white bag holds 2,500 pounds of Clay!
More New Clay
These bags of Clay have been distributed across the green to patch any low spots and areas around the base line that require a little more Clay.
More patching low spots before applying the layer of Clay across the entire court.
Large pile of Clay that was just dumped onto court #1 to be spread out level.
Bag of Clay being placed before cutting the bottom of the bag.
Bag once it is cut
Tractor with Laser level on the box blade getting ready to push pile of Clay smooth.
Laying out the new lines. This is a string line pulled first, then the lines will be nailed in over the top of the string line. This helps to be straight and accurate
New line installed along one side of court #5
This photo shows the lines behind nailed into the Clay. Notice the large white roll, it is the line material that is rolled out as they install. The nails are placed every few inches to keep the lines attached and smooth to the ground.
A lot of time consuming labor to install the lines. Hundreds of nails to drive in!!!
This court is all finished, all that remains is the net to be installed and it will be ready for play!!!!
Sunday, June 10, 2018
Bailing Hay!
After totaling over 5 inches of rain over the past 2 weeks, the bermuda grass is really growing! This week our staff set out to "catch-up" on mowing all the grass around the entire golf course. The wet conditions made it impossible to mow last week, so this week we had to mow everything twice!
Even the fairways have been growing very rapidly, but this has helped heal some of the thin areas left by the tough winter. After mowing two times last week we have caught up and the cut is beginning to look very nice!
This is after the first time we mowed on Monday morning! A lot of grass clippings to clean up!
Here is our Grounds Chairman Mark Kenline trying to walk over a pile of grass clippings! The rain caused the grass to grow so much we had to blow the waste into piles and remove!
Even the fairways have been growing very rapidly, but this has helped heal some of the thin areas left by the tough winter. After mowing two times last week we have caught up and the cut is beginning to look very nice!
Thursday, April 19, 2018
New Forward Tee on #7 Overlook!
Last week we finally got around to removing the last remaining "old style" bunker from #7 Overlook. This first bunker was on the right immediately after you cross the bridge while playing the hole. This bunker creates a funnel for carts creating a path between the bridge and the bunker, and is always a hard area to keep grass alive. When doing the bunker renovation this winter we did not touch this bunker, with full intention that our crew would fill it in this spring and create a much better cart entry. As you can see in the picture below, the bunker played very short for the hole and is only typically a hazard for high handicap golfers.
This photo was taken last November, 2017, before the Bunker Renovation started.
Our Staff on Monday started to cut sod around the bunker to try and save what we could. Once all the grass was removed we flatted out a few areas and filled in the bunker with soil. After a lot of tracking and compacting the soil down smooth, it was time to sod the area .
After we finished filling in the old bunker, it was time to build a new forward tee! We took the advantage of a dry week and really got a lot accomplished! The pictures below show the development of the new tee surface!
You can see in this picture versus the top picture of this post that we made some changes for sure!
Tuesday, March 20, 2018
Bunkers holding up to heavy rain storm as advertised!
Last night we got our first really strong thunderstorm of the year, an inch of rain which fell over the course of about an hour! This rush of water made quite the mess around the golf course, but one place that was a pleasant surprise....the new bunkers! While in the old days it would have taken our whole crew the better part of 2 days just to fix the bunkers, the new bunkers performed flawlessly for the most part, and hardly washed out at all. Some normal raking this morning was all it took to smooth out and prepare the bunkers for daily play. Take a look at the pictures below to show you the results we found this morning between two different bunkers on #7 Overlook.
Here is a picture of the old bunker we left on #7 Overlook. You can see how badly it washed out and held water last night during the rain. Last year all 65 bunkers would look similar to this after a heavy downpour, requiring hours of manual labor to push the sand back up!
Why did we leave this bunker and renovate all the others? Because we are planning to fill it in a build a new forward tee next to where it is located. We will do this in a few weeks once the grass greens up!
Here is a picture of the bunker right next to the old bunker in the previous picture. You can see the sand washing on the top side, but very minimal compared to what the old bunker looked like. The new capillary concrete bunker liner helps to drain water very quickly, preventing the washouts as these pictures have illustrated. This will save us a lot of money in labor over the years since we will no longer have to push all the sand back up!
Sunday, March 18, 2018
Bunker Project Completely Finished!
I am glad to announce the Bunker Renovation is completely finished! It took a little over 16 weeks, battling 2 snow storms and over 10 inches of rain during the project. All in all the finished product looks very nice, and once the grass starts to grow this summer it will fill in and look like it has been that way forever! The construction company, Pristine Golf, did a great job staying on task while trying to keep the damage to a minimum.
While there was definitely damage incurred during the project, our staff will now start to repair and clean up disturbed areas. We will start with the "in play" areas, then work our way out to the perimeter of the course. Concrete repairs will also take place over the next few weeks to help repair and improve our broken cart path panels across the golf course.
Subscribe to:
Posts (Atom)





