Thursday, June 28, 2018

Tennis Clay Courts


   Monday, June 25th was a great day to renovate our tennis courts!  The Club hired a contractor to install 40,000 pounds of new clay to court #1, and then use a laser level to completely re-build and re-grade the court.  This new clay will allow for an overall better playing surface, and has to be done every 5-8 years as a maintenance practice. The crew also took the opportunity to add 10,000 pounds of new clay to courts #5 and #6.  New lines were installed after the clay was added and leveled on all the courts.  We hope that you will find the new surfaces enjoyable and help improve your game!     

Please take a minute to look at the videos and pictures of the entire process!!!!!



This video shows the Clay being dumped onto the court for the tractor to push into place.



This video shows the tractor dragging the Clay across the court to "grade" it, or make it level.  This tractor has a Laser controlling the amount of Clay spread across the court.  The goal is to get the Clay as level and flat as possible, but still slightly sloped so the water drains when it rains.



This video shows one person installing Clay on courts #5 and #6, while the other person is dragging it around smoothly with a cart.  Since we put less Clay on these courts, the tractor was not needed.  Approximately a quarter inch of new Clay was installed on these courts to help freshen them up.


This video show them rolling the lines to flatten them into the new Clay profile.  This will help to ensure the lines are flat and secure to the ground.  The lines are rolled 5 or 6 times before the court is ready for play.





This shows the truck of Clay as it arrived.  Each large white bag holds 2,500 pounds of Clay!


More New Clay

These bags of Clay have been distributed across the green to patch any low spots and areas around the base line that require a little more Clay.

More patching low spots before applying the layer of Clay across the entire court.

Large pile of Clay that was just dumped onto court #1 to be spread out level.

Bag of Clay being placed before cutting the bottom of the bag.

Bag once it is cut

Tractor with Laser level on the box blade getting ready to push pile of Clay smooth.

Laying out the new lines.  This is a string line pulled first, then the lines will be nailed in over the top of the string line.  This helps to be straight and accurate

New line installed along one side of court #5

This photo shows the lines behind nailed into the Clay.  Notice the large white roll, it is the line material that is rolled out as they install.  The nails are placed every few inches to keep the lines attached and smooth to the ground.

A lot of time consuming labor to install the lines.  Hundreds of nails to drive in!!!

This court is all finished, all that remains is the net to be installed and it will be ready for play!!!!





Sunday, June 10, 2018

Bailing Hay!

After totaling over 5 inches of rain over the past 2 weeks, the bermuda grass is really growing!  This week our staff set out to "catch-up" on mowing all the grass around the entire golf course.  The wet conditions made it impossible to mow last week, so this week we had to mow everything twice!

This is after the first time we mowed on Monday morning!  A lot of grass clippings to clean up!


Here is our Grounds Chairman Mark Kenline trying to walk over a pile of grass clippings!  The rain caused the grass to grow so much we had to blow the waste into piles and remove!

 Even the fairways have been growing very rapidly, but this has helped heal some of the thin areas left by the tough winter.  After mowing two times last week we have caught up and the cut is beginning to look very nice! 

Thursday, April 19, 2018

New Forward Tee on #7 Overlook!

Last week we finally got around to removing the last remaining "old style" bunker from #7 Overlook.  This first bunker was on the right immediately after you cross the bridge while playing the hole.  This bunker creates a funnel for carts creating a path between the bridge and the bunker, and is always a hard area to keep grass alive.  When doing the bunker renovation this winter we did not touch this bunker, with full intention that our crew would fill it in this spring and create a much better cart entry.  As you can see in the picture below, the bunker played very short for the hole and is only typically a hazard for high handicap golfers.

This photo was taken last November, 2017, before the Bunker Renovation started.



Our Staff on Monday started to cut sod around the bunker to try and save what we could.  Once all the grass was removed we flatted out a few areas and filled in the bunker with soil.  After a lot of tracking and compacting the soil down smooth, it was time to sod the area .  

After we finished filling in the old bunker, it was time to build a new forward tee!  We took the advantage of a dry week and really got a lot accomplished!  The pictures below show the development of the new tee surface!





You can see in this picture versus the top picture of this post that we made some changes for sure!


Tuesday, March 20, 2018

Bunkers holding up to heavy rain storm as advertised!

Last night we got our first really strong thunderstorm of the year, an inch of rain which fell over the course of about an hour!  This rush of water made quite the mess around the golf course, but one place that was a pleasant surprise....the new bunkers!  While in the old days it would have taken our whole crew the better part of 2 days just to fix the bunkers, the new bunkers performed flawlessly for the most part, and hardly washed out at all.  Some normal raking this morning was all it took to smooth out and prepare the bunkers for daily play.  Take a look at the pictures below to show you the results we found this morning between two different bunkers on #7 Overlook.

Here is a picture of the old bunker we left on #7 Overlook.  You can see how badly it washed out and held water last night during the rain.  Last year all 65 bunkers would look similar to this after a heavy downpour, requiring hours of manual labor to push the sand back up!

  Why did we leave this bunker and renovate all the others?  Because we are planning to fill it in a build a new forward tee next to where it is located.  We will do this in a few weeks once the grass greens up!

Here is a picture of the bunker right next to the old bunker in the previous picture.  You can see the sand washing on the top side, but very minimal compared to what the old bunker looked like.  The new capillary concrete bunker liner helps to drain water very quickly, preventing the washouts as these pictures have illustrated.  This will save us a lot of money in labor over the years since we will no longer have to push all the sand back up!

Sunday, March 18, 2018

Bunker Project Completely Finished!




          I am glad to announce the Bunker Renovation is completely finished!  It took a little over 16 weeks, battling 2 snow storms and over 10 inches of rain during the project.  All in all the finished product looks very nice, and once the grass starts to grow this summer it will fill in and look like it has been that way forever!  The construction company, Pristine Golf, did a great job staying on task while trying to keep the damage to a minimum. 

          While there was definitely damage incurred during the project, our staff will now start to repair and clean up disturbed areas.  We will start with the "in play" areas, then work our way out to the perimeter of the course.  Concrete repairs will also take place over the next few weeks to help repair and improve our broken cart path panels across the golf course.
         
         

Saturday, March 10, 2018

Aerification was a success!

This Monday we carried out our Spring aerification process, and everything went smooth!  This year we punched 1/2 inch sized holes and removed plugs of organic matter across all 27 holes.  One thing different this year was the fact that we topdressed the greens with sand first, before punching holes.  By topdressing first we were able to significantly reduce the tracks left by the topdressing machine.  In the past we would topdress immediately after removing the plugs, and the greens were very soft and impressionable.  The heavy topdressing machine would leave tire marks visible for up to 3 months at times, as well as effecting the putting quality.  It appears our new method of topdressing first worked very well, and actually allowed us to move more rapidly than ever before.  We completed 25 greens, or a little over 4 acres of putting green surface in 1 day!  Congratulations to our whole staff for a job well done!

Here is a picture of the first green of the morning!  You can see the sand already on the green as the machine works along.

Here is a good view of the "core collector" attached to the back of the aerifier.  This tool helps to drag all the plugs to the side of the greens to be picked up and removed.

Core Collector filling up with plugs!  You can see in the bottom of the picture all the holes we punched in the greens.  These holes will soon be filled with new healthy roots for the grass plants!

#9 Green as we start to aerify.  The crew stands on each side to shovel plugs up into the utility vehicles.  We will dump these plugs in some cool season areas to grow, as the grass in the plugs is still very alive and healthy.


After punching holes, we drag the greens with a brush.  This brush helps to incorporate the sand into the holes to ensure they are all filled up and smoothed out.  We will then come behind the brush with a roller to roll the green smooth.

Here is a picture of the Topdressing machine, applying an even layer of sand before we punch holes.

Saturday, March 3, 2018

Shaping the final bunker!


Friday marked the time when we started work to renovate the last bunker on the golf course.  The lucky hole happened to be #12, and since it only had one small bunker it was all completed in one day.  Attached at the top is a video of the Shaper building the face of the bunker.  As you watch the video you will see the machine dump dirt along the top edge, and then smash it down to compact it.  He  will then use the bucket to shape out the face of the bunker, which will soon be sodded to bermudagrass.  When this video was taken he had already roughly shaped the right side of the bunker, and you can see it in the background of the video.  It is pretty impressive how well the operator can work the machine!