This is a look at the finished bunker liner, right before the sand is installed on top!!!
This picture shows the depth of material installed. It is approximately 3 inches deep, and is completely solid once dried and cured. Because of the large air pockets between the gravel in the concrete, water flows freely through into the drain pipes. During heavy rains it helps to prevent the sand from all washing out in the bunkers!
Some of the crew trowels the surface smooth and solid, while the other half is dumping another load of Capillary Concrete to be spread out for the men to trowel.
This picture shows the drainage in the bottom of the bunkers in the distance, as well as the finished Capillary Concrete in the fore ground. The plywood is placed under the machines doing the work from damaging the bunker liner or the sod.
No comments:
Post a Comment